
During
We have removed the old vinyl siding

During
We have removed the old vinyl siding

During
We have removed the old vinyl siding

During
We have removed the old vinyl siding

During
We have removed the old vinyl siding

During
Inspecting the old sheathing

Removing
Here we have removed the old siding and inspecting the sheathing

During
Installing new OSB Sheathing

housewrap
Installing the new vapor barrier over the OSB Sheathing

Housewrap
Installing the vapor barrier

Installing
Installing the new Allura 4x8 fiber boards

Installing
Installing the new board and baton siding

Finished
Putting the final touch ups on the paint

Finished
Putting the final touch up on the paint

Finished
This really is a big change from the start.

Finshed
The new board and baton has been installed and painted.

Finished
The final walk through was successful